top of page
HVAC design and heat loss calculations for Toronto and GTA building permits — BCIN #31364 certified — Saltzberry Design

HVAC Design Toronto & GTA — BCIN #31364 | 2026 E-Submission Compliant

Duct Design Layout and Drawings for HVAC Permit in the City of Toronto

Ventilation Design for Residential Construction

HVAC duct design layout for Toronto building permit — e-submission compliant — BCIN #31364 certified — Saltzberry Design

Dufferin Permit Resources

Saltzberry Design — BCIN #31364 Building Services & HVAC-House, HRAI #7515 certified — provides complete HVAC design and heat loss calculations for residential building permits across Toronto and the Greater Toronto Area.

We know Toronto's e-submission requirements. Drawings are delivered digitally signed, PDF compliant, black and white, correctly named and numbered to City of Toronto and GTA municipal standards — ready to submit without rejection. No formatting learning curve. No resubmission delays.

Standard turnaround: 2–5 business days. 48-hour rush available for urgent permit deadlines. From $599. Call 905.658.6452 for rush or complex projects.

Serving Toronto, Durham Region (Ajax, Whitby, Oshawa, Clarington, Pickering), York Region (King City, Aurora, Newmarket, Richmond Hill, Vaughan, Markham), Halton Region (Burlington, Oakville, Milton), and Peel Region (Brampton, Mississauga, Caledon).

Complete permit package: heat loss calculations (CSA F280-12), duct design, ventilation design, Schedule 1 (signed BCIN #31364), and EEDS (SB-12). All five documents, one submission, one timeline.

Call 905.658.6452 for permit deadlines. Submit drawings below for standard turnaround.

One of the biggest challenges of residential HVAC design in the GTA is the climate. The region has a humid continental climate, with hot summers and cold winters. In the summer, high humidity levels and intense heat can make it difficult to maintain comfortable temperatures in homes. In the winter, extreme cold and heavy snowfall can pose challenges for heating systems. HVAC designers must take these factors into account when designing systems that can effectively heat and cool homes in the GTA.

Another challenge of residential HVAC design in the GTA is the size and diversity of the region. The GTA is a large and rapidly growing area, with a mix of urban, suburban, and rural communities. Each of these communities has its own unique heating and cooling requirements, and HVAC designers must be familiar with the specific needs of each community in order to design effective systems.

The building types in the GTA also present additional challenges for residential HVAC design. The region is home to a mix of single-family homes, townhouses, and high-rise buildings, each of which has its own heating and cooling needs. The age and condition of the buildings in the GTA can also present challenges for residential HVAC design. Many homes in the GTA are older and may not have modern heating and cooling systems, and HVAC designers must be able to work with these older systems and know when tp incorporate them into new designs. Often these homes in the are in need of upgrades to improve energy efficiency and comfort. HVAC designers must be able to identify these needs and provide HVAC solutions that  fit the specific needs of each type project in order to design effective HVAC systems.

Toronto HVAC Permits
HVAC duct design layout for Toronto building permit — e-submission compliant — BCIN #31364 certified — Saltzberry Design

The sizes, CFM's and graphical representation of your duct trunk, branch and registers. Duct Design is the distribution of the calculated required conditioned air to be distributed to each room of the home. Designs are drafted to City of Toronto compliance e-design standards.

Mechanical ventilation design summary MVDS for Toronto building permit — BCIN #31364 certified — Saltzberry Design

Encompassing CAN F280 in addition to the OBC, our ventilation design service ensures the correct supply of fresh air and removal of exhaust air. We provide Simplified Connections along with Standalone Ventilation Design across the GTA.

Heat loss calculations for Toronto GTA residential building permit — CSA F280-12 compliant — Saltzberry Design BCIN #31364

Simply put, what will it take to heat and cool a home in Toronto. Using the Home's R-Values, SQ Footage, Window and door sizes and Toronto's weather data, we calculate your Furnace and AC size to keep you comfortable in all of Toronto's season's.

Call or TEXT:
905.658.6452
 

SD90SitStars.png

HEAT LOSS GAIN CALCULATIONS

DISTRIBUTION DESIGN

MVDS 2024 & VENTILATION DESIGN

HVAC NOTES AND DETAILS

ONTARIO SCHEDULE 1

Saltzberry Design provides HVAC Design Services for Residential Building Permits across Toronto and the GTA remotely — BCIN #31364, from $599, 48-hour rush available. Serving Toronto, King City, Oshawa, Clarington, Whitby, Bowmanville and Ajax. Call 905.658.6452.

Toronto HVAC Permt Resources

HVAC Permit Resources Toronto

The City of Toronto requires any electronic documents to be submitted via pdf, and signed digitally. They have specific naming, numbering and title blocking requirements that must be met. Drawings and documentation must be in black and white only. For more information please see:

Toronto accepts online Building Permit submission via email and city specific formatting requirements.

Toronto often requires you submit additional supporting documentation, including product specifications data and design details.

Region of Durham HVAC PERMIT 

Ajax accepts Building Permits Online, via email.

Clarington accepts Building Permits Online, via online portal. No noted formatting requirements

Township of Brock accepts Building Permits Online, via the Cloudpermit Format

Oshawa accepts Building Permits Online, via email, with no noted formatting requirements

Pickering accepts Building Permits Online, via email.

Uxbridge accepts Building Permits Online, via the Cloudpermit Format

Building Permits in the Region of Durham are issued by each local municipality, under the Ontario Building Code. Each city may have additional requirements that need to be met.

Durham Region building permit HVAC design — Ajax Whitby Oshawa Clarington — Saltzberry Design BCIN #31364
Durham HVAC Permit

CloudPermit is an online software allowing for online Building Permit submission. Many municipalities across Ontario have adopted CloudPermit to streamline the submission and communication of Building Code required documentation.

CloudPermt Help

Region of Halton HVAC PERMIT 

Burlington accepts Building Permits Online, via email. Burlington has specific naming, numbering and layout requirements.

Halton Hills does not accept Building Permits Online. No noted formatting requirements

Milton accepts Building Permits Online, via email

Oakville accepts Building Permits Online, via email, with some noted formatting requirements

Building Permits in the Region of Halton are issued by each local municipality, under the Ontario Building Code. Halton issues some site services permits.

Submission must be under 10mb and in unlocked pdf.

Halton Region building permit HVAC design — Burlington Oakville Milton — Saltzberry Design BCIN #31364
Halton HVAC Permit

Region of York HVAC PERMIT 

Aurora accepts Building Permits Online, via email. Burlington has specific naming, numbering and layout requirements.

East Gwillimbury does not accept Building Permits Online. No noted formatting requirements

King accepts Building Permits Online, via email

Markham accepts Building Permits Online, via email, with some noted formatting requirements

Building Permits in the Region of York are issued by each local municipality, under the Ontario Building Code. 

New Market accepts Building Permits Online, via their Development Portal.

Richmond Hill accepts Building Permits Online, via form, with some formatting requirements; flatten pdf, B&W, City Forms and single PDF by discipline.

Building Permit  Application- Vaughan

Vaughan accepts Building Permits.

Whitchurch-Stouffville accepts Building Permits Online, via email, with some noted formatting requirements

Region of York HVAC Pemit

Peel Region HVAC PERMIT 

Brampton accepts Building Permits Online, via online form and naming standards 

Caledon accepts Building Permits Online Only.

Building Permits in the Region of Peel are issued by each municipality, under the Ontario Building Code. 

Mississauga accepts Building Permits Online, via online form and with naming standards and city specific requirements 

PeelHVAC Permit
bottom of page